The City of Clermont, Florida, has awarded a contract to Bob Lee Electric, Inc. for electrical improvements to lift stations E3 and E17. The contract includes the replacement of various electrical components, including non-fuse disconnects, meter bases, main breakers, and transfer switches. The contractor must also provide backup generators, coordinate with the electric company, and obtain necessary permits. The contract has a duration of 65 days and a total value of $208,803.54. The key aspects of this contract include the scope of work, contract sum, commencement and completion of work, liquidated damages, and insurance requirements. Some of the key points are:
• Replacement of non-fuse disconnects with new 300 amp Stainless Steel Non-fuse disconnects
• Replacement of 300 amp meter bases with new 300 amp meter bases
• Replacement of 300 amp main breakers and enclosures with new 300 amp main breakers and stainless steel enclosures
• Replacement of 400 amp ONAN transfer switches and enclosures with new 400 amp ONAN transfer switches and stainless steel enclosures
• Replacement of wiring from generators to transfer switches and from transfer switches to main distribution panels
• Installation of new Myers hubs on all penetrations
• Replacement of old unistrut supports with new stainless steel unistrut supports
• Use of all stainless steel hardware
• Pulling of all necessary permits and arrangement for inspections as required
• Provision of backup 150 Kw generators while work is being performed
• Coordination with the electric company before work is performed
• Posting of all applicable permits at the job site
• Restoration of gravel to existing conditions
• Provision of testing and training to City of Clermont personnel
• Warranty of one (1) year parts and labor