Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Architecture
  5. ›Master Plan Study for East Campus Chilled Water Plant…

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

Master Plan Study for East Campus Chilled Water Plant (ECCP) and Chilled Water (CHW) Thermal Energy Storage (TES)

Won by Burns & McDonnell +1 more$800kAwarded 2/7/2022Multiple Award
Contract source

Awarded vendors

  • Burns & McDonnell
  • ZGF Architects

Description

This contract awards a combined architectural‑engineering team to develop a comprehensive master‑plan study for a new East Campus Chilled Water Plant and an associated Thermal Energy Storage system at Penn State University Park. The study will evaluate site options, develop program requirements, produce conceptual designs, perform sustainability and energy analyses, and generate cost‑scenario estimates to guide a future design‑build procurement. • Scope includes site evaluation, building and tank façade options, mechanical and electrical system concepts, underground utility coordination, and high‑performance/LEED compliance. • Deliverables: draft and final report, graphics for stakeholder presentations, cost‑estimate models, and a high‑level schedule for subsequent design phases. • The award was made through a full open competition process, with the final team comprising Burns & McDonnell and ZGF Architects.

Attached files

Key dates

Bids closed
12/2/2021
Intent to award
2/7/2022
Awarded
2/7/2022
Starts
2/1/2022
Ends
8/1/2022
Duration
7 months

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541330
Solicitation №
00-07057.00

Contract value

$800,000

No monetary value is disclosed in the documents. Master‑plan studies for campus‑scale chilled‑water plants typically range from $500 K to $1.5 M depending on scope depth, required modeling, and consulting team composition. Considering the extensive mechanical, electrical, civil, and sustainability analyses required, plus involvement of two large professional firms, a reasonable ballpark is about $800 K. This estimate assumes a firm‑fixed‑price arrangement covering all deliverables and reimbursable expenses.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

University of Massachusetts·Massachusetts

Top match · 72%

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

UCLA Capital Programs·California

72% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

Virginia Community College System - System Office·Virginia

71% match

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

North Carolina East Carolina University·North Carolina

70% match

East Carolina University

Closes 11/5/2026Opened 10/6/2026

Trident Technical College·South Carolina

70% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

Massachusetts Department of Environmental Protection·Massachusetts

69% match

DEP-BPE-RFR-2026-CERP-Wastewater Energy Recovery Pilot Grant (WWER) GRANT ANNOUNCEMENT ONLY

Closes 10/23/2028Opened 5/8/2026

Trident Technical College·South Carolina

69% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

University of South Carolina·South Carolina

69% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

Northeast Wisconsin Technical College·Wisconsin

69% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

Oregon Department of Administrative Services·Oregon

68% match

HVAC Water Treatment - Hot/Cold Water Systems Services for DAS-Owned Buildings

Closes 11/3/2026Opened 8/6/2026

Town of Arlington·Massachusetts

68% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

Dormitory Authority of the State of New York·New York

68% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (Small Business Concerns and Minority Business Concerns only)

Closes 12/16/2026Opened 10/30/2026

Greenville County Schools·South Carolina

68% match

HVAC Water Treatment

Closes 11/17/2026Opened 10/23/2026

Oregon Health and Science University·Oregon

68% match

Supplemental Campus Development Plan

Rolling / TBD closeOpened 7/1/2019

Muscatine Power and Water·Iowa

68% match

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 11/11/2027Opened 9/1/2026

U.S. Department Of Defense·District of Columbia

68% match

Shipboard Air Conditioning Plant System Sustainment Plan (SSP)

Closes 11/16/2026Opened 10/23/2026

Orange County, Florida·Florida

68% match

DESIGN BUILD - ORANGE COUNTY CONVENTION CENTER NORTH - SOUTH BUILDING CHILLED WATER SYSTEM UPGRADE

Closes 11/5/2026Opened 9/14/2026

Connecticut UConn Health Center·Connecticut

68% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Energy·Tennessee

67% match

Building Technologies Research and Integration Center: Technology Collaborations for US Building Technologies Industries

Closes 12/13/2028Opened 12/13/2023

NYSERDA·New York

67% match

Clean Heat for All: Packaged Terminal Heat Pump Program - Phase II

Closes 6/30/2027Opened 10/10/2025

City of Ontario·California

67% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Corona·California

67% match

Microgrid Feasibility Study-Lester Water Treatment Plant and Chase Booster Station

Closes 11/23/2026Opened 10/22/2026

Nyack Public Schools·New York

67% match

Capital Projects Update 6-6-23(opens in new window/tab)

Rolling / TBD closeOpened 3/5/2024

NYS Cornell University·New York

67% match

SUCF# 161105 Replace Cooling Tower - Kenneth Post Laboratory

Closes 11/13/2026Opened 10/22/2026

Muscatine Power and Water·Iowa

67% match

UNIT 10 COMBINED HEAT AND POWER PLANT CONTRACT 281 – BALANCE OF PLANT

Closes 11/11/2027Opened 9/1/2026