The Hodges Slope Repair project involves the removal of cover soil within a portion of the landfill and repairing the geomembrane cap. The project also includes the relocation of gas monitoring probes and the replacement and compaction of soil, followed by permanent seeding. The cost estimate range for this project is between $100,001 and $500,000. The bid was rejected, and no vendor was awarded the contract.
• The project requires a total lump sum bid.
• The bid was posted on July 29, 2016, and the submission date was August 17, 2016.
• A pre-bid conference was held on August 10, 2016.
• The project documents, including the RFB, specifications, and plan set, are available for download.
• The contract was not awarded to any vendor, and all bids were rejected.