This contract is for the repair of a fume hood at the Logan Laboratory, with a total cost of $2,269.27. The work includes the installation of fume hood cables and other necessary repairs. The contract was awarded to 424 Laboratories LLC DBA Laboratory Design & Supply. Key aspects of the contract include:
• The contract duration is 31 days
• The total cost is $2,269.27
• The vendor is responsible for the installation of fume hood cables and other necessary repairs
• The contract was awarded through a competitive process
• The contract is for a specific project, with a clear scope of work and deliverables