This contract involves the replacement and upgrade of traffic‑signal infrastructure at the intersection of N. Moreland Blvd. and Michigan Ave. in Waukesha, Wisconsin. The scope includes removal of existing curbs, gutters, sidewalks, and concrete medians; installation of new concrete curb/gutter/sidewalk sections; pavement milling, hot‑mix asphalt patching, and base preparation; installation of inlet protection, storm‑inlet frames, conduit, pull‑boxes, and other electrical hardware (city‑furnished); and provision of traffic‑control equipment and detour signage. An optional alternate allows for the abandonment of an existing hydrant assembly. The project is priced as a fixed‑price bid of roughly $425 k with a single $9 k alternate, resulting in a total ceiling near $444 k.