The contract is for the 112th Avenue NE/108th Avenue NE Pedestrian & Bicycle Improvements project, with an engineer's estimate of $800,000. The scope of work includes removing pavement markings, asphalt concrete pavement, and cement concrete sidewalk, as well as constructing new cement concrete sidewalk, traffic curb, and gutter. The project also involves installing signal poles, mast arms, and rectangular rapid flashing beacon systems. The winning vendor, Kamins Construction, submitted a bid amount of $821,680.00.
• Remove Pavement Markings and RPMs
• Remove Asphalt Concrete Pavement
• Remove Cement Concrete Sidewalk and Traffic Curb and Gutter
• Remove Trees
• Remove and Replace Catch Basin Frames and Grates
• Remove Luminaire
• Place Asphalt Concrete Pavement
• Construct Cement Concrete Sidewalk, Traffic Curb and Gutter and Pedestrian Curb Ramps
• Install Signal Pole and Mast Arm
• Install Rectangular Rapid Flashing Beacon Systems
• Place Pavement Markings and RPMs
• Remove and Install Signs, Posts, and Anchors
• Property Restoration and Miscellaneous Work