The contract is for the replacement of an existing 110' wood pole with a 115' steel pole, including digging a new lined hole, setting the new pole, and transferring PUD facilities and UG secondary service. The project is located at 3800 88th St NE in the City of Marysville, Snohomish County, Washington. The engineer's estimate for the project is $145,000. The contract was awarded to Titan Electric Contracting Inc. in the amount of $81,537.67 plus tax. Key aspects of the project include:
• Replacement of an existing 110' wood pole with a 115' steel pole
• Digging a new lined hole and setting the new pole
• Transferring PUD facilities and UG secondary service
• Abandoning the existing pole to existing joint utilities
• Providing CMP, CDF, and all other pole foundation materials
• Performing work at 3800 88th St NE in the City of Marysville, Snohomish County, Washington