The contract is for the 2019 Local and Collector Street Mill and Overlay project, which involves milling and resurfacing of residential asphalt streets in three areas, including approximately 126,000 square yards of 2” depth full width milling, 15,000 tons of 2” depth asphalt surface replacement, replacement of pavement markings, installation of 90 ADA sidewalk ramps, 6,000 linear feet of sidewalk removal and replacement, and 54,000 linear feet of spot curb replacement. The contract was bid on by multiple vendors, with the lowest bid being $2,689,120.50 by Freeman Concrete Construction, LLC. The contract has a grand total of $3,198,829.60, including an owner's contingency allowance of $130,000.00. The scope of work includes removal and replacement of concrete curb and gutter, removal and replacement of concrete driveways, installation of ADA sidewalk ramps, and pavement marking.