The 2012 Bridge Repair Program is a contract for the repair of bridge structure #1, located along Renner Road, south of Midland Drive, in Shawnee, Kansas. The project includes the installation of concrete approach slabs, bridge painting, abutment strip drains, abutment concrete repair, and other related improvements. Bidders are required to submit both an electronic bid and a paper bid to be considered a qualified bidder for this project. The contract documents may be obtained from the QuestCDN website or from the Shawnee City Hall, Development Services Department. The bid opening date was April 5, 2013, at 10:00 AM. The engineers' estimate for the project is $194,380.00. Some key features of the project include:
• Mobilization: 1 unit
• Pavement Removal: 106 units
• Class I Excavation: 304 units
• Compaction of Earthwork: 304 units
• Contractor Furnished Backfill: 150 units
• Abutment Strip Drain: 140 units
• Bridge Backwall Protection System: 160 units
• Bridge Painting: 1 unit
• Abutment Concrete Repair: 150 units
• Temporary Shoring: 1 unit