This contract is for the replacement of the existing bridge with a new single-span, cast-in-place, prestressed concrete voided slab structure on a similar alignment as the existing structure. The replacement bridge will be 57 feet long and 25.5 feet wide and have cantilever wingwalls. The project will include a paved new approach with side slope orientation and Rock Slope Protection (RSP). The contract was awarded to three vendors: Chapco Construction LLC, Myers and Sons Construction, and Viking Construction Company. The total value of the contract is estimated to be around $2.4 million to $2.6 million.
• The project includes construction staking, construction area signs, traffic control system, type III barricade, portable changeable message sign, and job site management.
• The project also includes preparation of water pollution control program, fiber rolls, permanent erosion control establishment work, temporary silt fence, and temporary construction entrance.
• The contract includes various other items such as roadway excavation, structure excavation, structure backfill, imported borrow, hydroseed, and class 2 aggregate base.
• The contract also includes hot mix asphalt, place hot mix asphalt dike, place hot mix asphalt, and 24" cast-in-drilled-hole concrete piling.
• The project includes structural concrete, bridge footing, bridge, and bridge (polymer fiber), as well as joint seal, bar reinforcing steel, and bridge removal.
• The contract includes rock slope protection, rock slope protection fabric, fence, remove fence, relocate gate, object marker, furnish single sheet aluminum sign, and roadside sign.
• The project includes tubular bicycle railing, transition railing, alternative in-line terminal system, crash cushion, and concrete barrier.