The contract is for the construction of a new parking lot at the Keene Road Trail Head. The project includes the installation of approximately 0.40 acres of 2 inches of 3/8” HMA asphalt and 4 inches of crushed surfacing top course. The work also includes the installation of curb, gutter, decorative block wall, stormwater drainage ditches/swale, and required landscaping. The estimated cost of the project is between $157,600 and $216,700.
• The project includes the installation of HMA asphalt and crushed surfacing top course.
• The work includes the installation of curb, gutter, decorative block wall, stormwater drainage ditches/swale, and required landscaping.
• The estimated cost of the project is between $157,600 and $216,700.
• The contract was awarded through a competitive bidding process.
• The City of Richland is the agency responsible for the contract.