The Taxiway Edge Light Replacement contract is for the replacement of taxiway edge lights at the Peter O. Knight Airport. The contract was awarded to H.L. Pruitt Corp. and has a duration of 191 days. The contract includes requirements for warranties, insurance, and performance bonds. The contractor is responsible for replacing the existing taxiway edge lights with new ones, and for performing the work in accordance with the contract documents and specifications.
• The contract includes a warranty period for the work performed and the materials used.
• The contractor is required to provide insurance certificates and performance bonds.
• The contract has a total budget of $293,340.
• The contractor is responsible for complying with all applicable laws and regulations, including those related to labor, safety, and environmental protection.
• The contract includes a provision for the owner to reject any work that does not meet the requirements of the contract documents.