Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Construction
  5. ›Hot Mix Paving, Milling, and Site Restoration (CD Areas…

Awarded contract·Allegheny County·Pennsylvania

Hot Mix Paving, Milling, and Site Restoration (CD Areas Included)

Won by Anthony D. Folino Construction, Inc.$3MSingle Award
Contract source

Awarded vendors

  • Anthony D. Folino Construction, Inc.

Description

This contract is for hot mix paving, milling, and site restoration services in Allegheny County, Pennsylvania. The contract was awarded to Anthony D. Folino Construction, Inc. and has a duration of 2 years, from March 1, 2017 to February 28, 2019. The contract includes various services such as rigid base repair, flexible base repair, and mechanical patching. The estimated cost of the contract is not specified, but it is noted that there is no county use or expenditure. • Rigid base repair with concrete up to 18" below the concrete, brick, or block • Flexible base repair up to 18" depth • Mechanical patching (replace with binder) 0-200 sq. yds. • Other services such as trolley track removal, concrete replacement, and spoil material removal/disposal.

Attached files

Key dates

Starts
3/1/2017
Ends
2/28/2019
Duration
2 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
7824

Contract value

$3,000,000

The estimated value of the contract is not specified, but based on the services included, it is likely to be in the range of $1 million to $5 million. This estimate is rough and based on the assumption that the contract will cover a significant amount of work in Allegheny County over the 2-year period.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Department of Transportation·California

Top match · 71%

Hot Mix Asphalt, imported borrow and signal and lighting system.

Closes 12/2/2026Opened 10/19/2026

Burlington Township·New Jersey

71% match

Addendum #1 - "Milling & Overlay of Various Streets", Contract No. 2024-07

Rolling / TBD closeOpened 4/20/2026

Department of Parks, Recreation and Tourism·South Carolina

71% match

Golf Course Cart Path Paving-Hickory Knob State Resort Park

Closes 11/11/2026Opened 10/14/2026

California Department of Transportation·California

71% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

City of Worcester·Massachusetts

70% match

Paving Mix (Hot Winter) / DPW

Closes 11/18/2026Opened 10/20/2026

City of Huron·South Dakota

70% match

2026-03 Milling and Overlay BT

Closes 12/31/2026Opened 2/18/2026

California Department of Transportation·California

70% match

Cold plane and place HMA, replace culverts and replace delineation.

Closes 12/2/2026Opened 10/26/2026

City of Broken Arrow·Oklahoma

69% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

City of Fort Wayne·Indiana

69% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Los Angeles County Public Works·California

69% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

Lapeer County Road Commission·Michigan

69% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

Texas Department of Transportation·Texas

69% match

LOCAL LET MAINTENANCE CONTRACT, JIM WELLS CO, HOT MIX

Closes 11/17/2026Opened 10/26/2026

City of Fernandina Beach, FL·Florida

69% match

Asphalt Milling and Patching

Closes 11/24/2026Opened 10/30/2026

Texas Department of Transportation·Texas

69% match

LOCAL LET MAINTENANCE CONTRACT, CAMERON CO, HOT MIX

Closes 11/23/2026Opened 10/30/2026

California Department of Transportation·California

68% match

Cold plane, HMA, RHMA, bridge rehab, culvert, and electrical work.

Closes 11/10/2026Opened 9/21/2026

City of Columbia·South Carolina

68% match

Grounds Maintenance, Tree Removal, Turf Restoration & Debris Removal

Closes 11/6/2026Opened 10/6/2026

California Department of Transportation·California

68% match

RHMA, cold plane AC pavement, vegetation control (minor Conc) and MGS.

Closes 12/1/2026Opened 10/5/2026

Texas Department of Transportation·Texas

68% match

LOCAL LET MAINTENANCE CONTRACT, MADISON CO, HOT MIX

Closes 11/18/2026Opened 10/22/2026

George County Board of Supervisors·Mississippi

68% match

GC Annual Bid - Cold Milling 2027

Closes 11/3/2026Opened 10/1/2026

City of Ontario·California

68% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

California Department of Transportation·California

68% match

Cold plane, HMA, curb ramp, culvert, and modify electrical system.

Closes 11/18/2026Opened 10/12/2026

California Department of Transportation·California

68% match

Cold plane AC Pvmt, RHMA-G overlay, landscape, Elect., and drainage.

Closes 12/16/2026Opened 10/26/2026

York County·South Carolina

68% match

Asphalt Resurfacing for Solid Waste Convenience Center

Closes 11/4/2026Opened 10/8/2026

Henrico County·Virginia

68% match

Paver Laid Full Depth Reclamation

Closes 11/4/2026Opened 10/6/2026

Massachusetts City of Worcester·Massachusetts

68% match

CR-8850-M7 Paving Mix, Hot Winter / DPW

Closes 11/18/2026Opened 10/26/2026