The contract is for the renovation of the 3rd floor lab at Lyndon B. Johnson Hospital, which is part of the Harris Health System. The project involves phases 3-6 of the lab renovation and includes the installation of a new Deionized water system. The contractor, O'Donnell/Snider Construction, was awarded the contract through a competitive sealed proposal bid process. The estimated total construction cost is $2,168,242.36, which includes the original bid price of $1,826,363 and an owner's contingency of $341,879. The project is expected to support patient care and involves the modification of the existing DI water loop to re-activate the new DI water system serving the LBJ Pathology Lab. Key aspects of the contract include:
• The contract was awarded to O'Donnell/Snider Construction through a competitive bid process
• The project involves the renovation of the 3rd floor lab at Lyndon B. Johnson Hospital
• The estimated total construction cost is $2,168,242.36
• The project includes the installation of a new Deionized water system
• The contract is for a single vendor, O'Donnell/Snider Construction