The Town of Derry, NH issued RFP B21‑170 to replace the existing skate park at Alexander Carr Park with a new concrete design‑build facility. The scope includes demolition of the existing park, full design services (pre‑design, final design, renderings), permitting, site grading, utility coordination, drainage, storm‑water management, and construction of a cast‑in‑place concrete skate park featuring bowls, ramps, ledges, and related amenities. The contractor must submit three size options (100 × 50 ft, 100 × 75 ft, 100 × 100 ft) with detailed cost breakdowns, a complete project schedule, and meet specific material and qualification criteria. The RFP was released 13 Sept 2021, pre‑bid meeting 24 Sept 2021, questions due 1 Oct 2021, answers posted 8 Oct 2021, and final proposals were due 22 Oct 2021. The town has not yet allocated funding; the award will be made on a best‑value basis. The contract requires performance and payment bonds per NH law and liability insurance of at least $1 million.
• Demolition, design, permitting, and full concrete construction of a new skate park.
• Mandatory submission of three park‑size cost options and a detailed schedule.
• Evaluation based on price, schedule, performance history, and ability to meet specifications.