Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Manufacturing
  5. ›Metal Spun Venturi Tubes

Awarded contract·City of Spokane·Washington

Metal Spun Venturi Tubes

Won by Tiercel Technology (JGW Machine Ltd.)$50kAwarded 11/1/2024Single Award
Contract source

Awarded vendors

  • Tiercel Technology (JGW Machine Ltd.)

Description

The City of Spokane issued RFQ 6191‑24 for the supply of metal‑spun venturi tubes in carbon‑steel and 304 stainless‑steel, with tiered pricing based on quantity and a one‑time tooling fee. The contract spans a five‑year period (2025‑2029) with unit prices valid through 12/31/2025 and lead times ranging from 56 days to 12 weeks. Tiercel Technology (JGW Machine Ltd.) was selected as the awardee. • Scope: Provide metal‑spun venturi tubes (carbon‑steel & 304 stainless) with optional tooling engineering fee. • Pricing: Unit‑price tables (≈ $171‑$295 per tube) plus a $4,356.70 tooling fee; price validity 1 Jan 2025‑31 Dec 2025. • Schedule: Lead times 56 days, 8 weeks ARO, or 12 weeks depending on tier; contract term Jan 2025‑Dec 2029.

Attached files

Key dates

Bids closed
9/30/2024
Intent to award
11/1/2024
Awarded
11/1/2024
Starts
1/1/2025
Ends
12/31/2029
Duration
5 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Manufacturing
NAICS
332913
Solicitation №
RFQ 6191-24

Contract value

$50,000

The RFQ’s engineer estimate cites an annual spend of roughly $10,000 (≈ $50,000 over five years). Using the highest tier unit price ($295) for a potential maximum of 50 tubes per year yields $14,750 annually, plus the $4,356 tooling fee, for a total of about $19,100 per year or $95,500 over five years. Given the engineer’s “more or less” estimate, a reasonable ball‑park is $50,000–$100,000; I will adopt the midpoint of the engineer’s figure, $50,000, as the best available estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

University of Wisconsin Madison·Wisconsin

Top match · 57%

Titanium Stirred 2-Reactor System with Controls for 4 Reactors

Closes 11/3/2026Opened 10/22/2026

U.S. Department Of Energy·Ohio

55% match

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Wick and Fill Platform

Closes 12/3/2026Opened 6/4/2026

University of Wisconsin‑Madison·Wisconsin

54% match

Titanium Stirred 2-Reactor System with Controls for 4 Reactors

Closes 11/3/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

54% match

TUBE ASSEMBLY,METAL

Closes 11/9/2026Opened 10/28/2026

U.S. Department Of Energy·New York

54% match

Seamless 21-6-9 Tubing

Closes 11/10/2026Opened 10/28/2026

U.S. Department Of Defense·Pennsylvania

54% match

TUBE

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Justice·Indiana

53% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

53% match

47--TUBE,METALLIC

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

53% match

47--TUBE ASSEMBLY,METAL

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·California

53% match

47--TUBE ASSEMBLY,METAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

53% match

47--TUBE ASSEMBLY,METAL

Closes 11/11/2026Opened 10/28/2026

Louisiana Grambling State University·Louisiana

53% match

(50) HEAT PUMP FAN COIL UNITS

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Defense·Oklahoma

53% match

47--TUBE,METALLIC

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

53% match

FAN,TUBEAXIAL

Closes 11/25/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

53% match

47--TUBE ASSEMBLY,METAL

Closes 11/8/2026Opened 10/27/2026

City of Dublin·Ohio

53% match

Golf Center at SportsOhio — Infrared Tube Heater Replacement Project

Closes 11/23/2026Opened 10/23/2026

University of Massachusetts·Massachusetts

52% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

52% match

47--TUBE,METALLIC

Closes 11/1/2026Opened 10/22/2026

Norton Housing Authority·Massachusetts

52% match

Tub Surround & Shower Valve Replacement REBID

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Illinois

52% match

STEEL TUBE

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

52% match

26--INNER TUBE,PNEUMATIC T

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Colorado

52% match

J045--Correction and Rebuild of Shell and Tube Heat Exchangers: One time Service

Closes 11/10/2026Opened 10/30/2026

Virginia Polytechnic Institute and State University·Virginia

52% match

VT Forestry Research Operations Center

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

52% match

47--TUBE,METALLIC

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

52% match

FD2030-26-01596

Closes 3/17/2027Opened 3/17/2026