The Module 4 Landfill Gas Collection System Expansion project involves the construction of a landfill gas collection system at the Neal Road Recycling and Waste Facility in Butte County, California. The project includes vertical landfill gas well drilling, vertical landfill gas well construction, trenching and excavation for below grade landfill gas lateral collection piping, installation of vertical and horizontal landfill gas wellheads, and restoration of soil erosion cover. The project was bid on by three companies: Tetra Tech BAS, Inc., Blue Flame Crew West, LLC, and Innovative Construction Solutions. The bid amounts were $295,213.20, $339,786.00, and $355,999.25, respectively. The project is expected to be completed in accordance with the California Department of Transportation 2010 Standard Specifications and the Special Provisions.
• The project involves the construction of a landfill gas collection system
• The project includes vertical landfill gas well drilling and construction
• The project includes trenching and excavation for below grade landfill gas lateral collection piping
• The project includes installation of vertical and horizontal landfill gas wellheads
• The project includes restoration of soil erosion cover
• The project was bid on by three companies
• The bid amounts were $295,213.20, $339,786.00, and $355,999.25, respectively