This contract calls for the wet‑method demolition of structures at 1254 Eslava Lane, Mobile, AL, including utility disconnection, debris removal, site clearing, erosion‑control BMPs, and final site stabilization. The City requires the contractor to hold a current Mobile business license, be enrolled in E‑Verify, provide comprehensive insurance, and submit extensive documentation (photos, waste shipment records, newspaper notice of final completion, and AIA affidavits). The work must be completed within 15 calendar days after receipt of the Notice to Proceed, with a $250 per day liquidated‑damage penalty for delays. The solicitation was a sealed‑envelope RFQ, with the lowest responsible bidder awarded the contract.
• Wet demolition, utility capping, hazardous‑material (lead/asbestos) handling, and full site clean‑up.
• Mandatory erosion‑control measures and permanent site stabilization before close‑out.
• Strict post‑completion documentation and a rapid 15‑day performance window.