Description
The City of Wilmington is seeking qualified contractors to demolish the deteriorated Best Western Plus Coastline Inn pier and replace the underlying concrete pad. The work includes utility disconnection, selective removal of timber and steel pier elements, disposal of all debris (including hazardous materials), installation of erosion‑control measures, back‑filling, and site restoration. The contract will be awarded through an open competitive Request for Bid, with a maximum contract amount left blank for bidders to propose. The project must meet a 14 % MWBE subcontracting goal, carry standard municipal insurance and bonding, and adhere to strict safety, environmental, and schedule requirements, including a 90‑day completion window and $250 per day liquidated damages for overruns.
• Scope: full demolition of pier, utility removal, concrete pad replacement, waste disposal, and site grading/rehabilitation.
• Schedule: Pre‑bid on June 13, 2024; bids due June 27, 2024; work must start within 45 days after NTP and finish within 90 days.
• Requirements: 14 % MWBE subcontracting, CGL/Workers’ Comp/Auto liability insurance (minimum $3 M each), performance/payment bonds, EPA/NC DEQ compliance, and hurricane preparedness plan.