The Bayside Terrace Subdivision Drainage Improvements Project involves the construction of new storm manholes, storm sewer leads, inlets, waterline, concrete pavement, driveways, and related appurtenances within the city right-of-way. The project aims to improve the drainage system in the Bayside Terrace Subdivision. Key aspects of the project include:
* Construction of new stormwater infrastructure
* Installation of new waterlines and sewer lines
* Removal and disposal of existing asphaltic surface, driveways, and concrete pavement
* Excavation and backfilling of trenches
* Installation of new concrete pavement, driveways, and sidewalks
* Relocation of existing utilities and services
* Construction of a new storm outfall, including a type PZ22 sheet pile, concrete cap, apron, backfilling, sawcutting, fencing, and hardware accessories.
The project requires the contractor to provide all necessary labor, materials, and equipment to complete the work. The contract duration and start date are not specified in the provided text.