Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›SWR - Operations Center Transformer Access Walkway

Awarded contract·Snohomish County PUD·Washington

SWR - Operations Center Transformer Access Walkway

Won by Accord Contractors LLC$90kSingle Award
Contract source

Awarded vendors

  • Accord Contractors LLC

Description

The contract is for the construction of a walkway and platform to provide access to transformers and switches at the Operations Center. The work includes approximately 100 feet of thickened-edge concrete sidewalk, 25 feet of normal sidewalk, and a 400 square foot concrete pavement access platform. A removable safety railing is also included in the scope of work. The engineer's estimate for the project is $75,000.00. • The project location is 1802 75th Street SW, Everett, WA, Snohomish County. • Contractors must be on the District's Small Works Roster and currently prequalified for Category: "Concrete Construction" or "General Construction" prior to bidding. • Bids shall be submitted electronically through the Public Purchase website. • A pre-bid meeting was scheduled for July 20, 2022, at 11:00 a.m. to allow a site inspection and to answer questions regarding the scope of work, site conditions, and any matters of general concern.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
22-1312-SC

Contract value

$89,668

The engineer's estimate for the project is $75,000.00, and the bid proposal from Accord Contractors LLC is $89,668.00. Based on this information, the estimated value of the contract is around $89,668.00. The factors that may influence the likely contract value include the scope of work, materials, labor, and equipment required for the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Des Moines - Iowa·Iowa

Top match · 62%

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Douglas WY·Wyoming

62% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

U.S. Department Of Defense·Kansas

62% match

Switchgear Transformer Replacement

Closes 11/16/2026Opened 10/28/2026

City of Charlotte·North Carolina

62% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Miami-Dade County·Florida

62% match

Traffic Circle at SW 62nd Ave. And SW 48th Street

Closes 12/2/2026Opened 10/23/2026

City of Vernon·California

62% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

U.S. Department Of Defense·Oklahoma

61% match

15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

Closes 11/10/2026Opened 10/27/2026

NYS Erie County Department of Environment and Planning·New York

61% match

Big Sister WRRF Influent Roof & Cayuga PS Roof/Ventilation Replacement

Closes 11/3/2026Opened 10/20/2026

NYS Titan Roofing, Inc.·New York

61% match

Reconstruct Roof at Facilities Building – SUNY Poly

Closes 12/8/2026Opened 10/28/2026

Miami-Dade County·Florida

61% match

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

Terrebonne Parish Consolidated Government·Louisiana

61% match

RFP 26-ELTDIST-24 (Re-Advertisement) Power Line Right of Way Clearance & Tree Trimming

Closes 11/23/2026Opened 10/28/2026

NYS Titan Roofing, Inc.·New York

61% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

U.S. Department Of Defense·Illinois

61% match

CSSC Utility Feed Transformer Replacement

Closes 11/5/2026Opened 10/27/2026

U.S. Department Of Veterans Affairs·Pennsylvania

61% match

Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·Pennsylvania

61% match

TRANSFORMER, PSRL

Closes 11/2/2026Opened 9/30/2026

Department of Transportation·South Carolina

60% match

OPEN GRID DECK 22X60 D3 BRIDGE

Closes 11/12/2026Opened 9/29/2026

City of Sacramento·California

60% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

NYS Rochester, City of·New York

60% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

City of Bakersfield·California

60% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

Jea·Florida

60% match

1412223281 (ITN) Enterprise Asset Management Software Solution

Rolling / TBD closeOpened 10/1/2026

University of Mississippi Medical Center·Mississippi

60% match

SS6009 for Pressure‑sensing Walkway System

Closes 11/13/2026Opened 10/26/2026

Rochester Public Utilities·Minnesota

60% match

Power Transformer - Zumbro River Substation

Closes 11/23/2026Opened 10/13/2026

NYS Washington, Town of·New York

60% match

Oak Summit Road Over Sprout Creek Culvert Replacement

Closes 11/17/2026Opened 10/19/2026

NYS East Fishkill, Town of·New York

60% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Missouri Department of Transportation·Missouri

60% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026