This contract involves the demolition and site remediation of a deteriorated wood‑frame structure at 7231 11th Street, Mobile, AL. The City of Mobile Municipal Enforcement Department issued a Request for Quote (RFQ) and selected NU VISION CONSTRUCTION INC. to perform wet‑method demolition, utility cap‑offs, debris removal, erosion and sediment control, and post‑demolition site seeding and mulching. The contractor must comply with Clean Water Act regulations, lead‑based paint and asbestos NESHAP requirements, and provide all insurance, E‑Verify proof, and required AIA documentation. The work must be completed within 15 calendar days after receipt of the Notice to Proceed, with a $250 per day liquidated‑damage penalty for delays beyond that period.
• Wet demolition of the entire structure, foundations, utilities, and surrounding vegetation.
• Installation of temporary BMPs (silt fences, berms) and permanent site stabilization (seed, mulch).
• Mandatory waste‑shipment records for lead‑based paint/asbestos disposal and adherence to City insurance and certification requirements.