The contract is for the 108th AVE NE Complete Street project, which involves removing and reconstructing asphalt pavement, cement concrete curb, gutter, and sidewalk, as well as storm drainage improvements and modifying the signalization system. The engineer's estimate for the project is $1,416,760.00. The contract was awarded through a public bid process, with six bidders submitting proposals. The bidders and their total bid prices are listed in the document. The project is expected to involve various types of work, including roadway excavation, asphalt pavement construction, and channelization. The contract is likely to be a fixed-price contract, given the nature of the work and the engineer's estimate provided.
• The contract involves a range of construction activities, including asphalt pavement removal and reconstruction, cement concrete curb and gutter construction, and storm drainage improvements.
• The engineer's estimate for the project is $1,416,760.00, and the bidders' total bid prices range from $1,287,326.00 to $1,548,548.00.
• The contract was awarded through a public bid process, with six bidders submitting proposals.
• The project is expected to involve various types of work, including roadway excavation, asphalt pavement construction, and channelization.
• The contract is likely to be a fixed-price contract, given the nature of the work and the engineer's estimate provided.