Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Construction
  5. ›IDOT D3- Near Rock Rapids- Installation of Tile Crossing…

Awarded contract·Iowa Department of Transportation (Iowa DOT)·Iowa

IDOT D3- Near Rock Rapids- Installation of Tile Crossing under IA-9 at Station 1103+50 (MP: 17.49)

$300kSingle Award
Contract source

Description

The Iowa Department of Transportation (Iowa DOT) is seeking a qualified contractor to provide labor, materials, and equipment to install 120' of new 8" tile crossing under IA-9 at DOT Station 1103+50 (MP: 17.49) in Lyon County. The project includes the installation of encasement pipe and connection to a 6" tile on the north and south sides of IA-9. The contract term is estimated to start on 6/1/25 and end on 8/1/25. The Iowa DOT will provide a list of items requiring inspection prior to or during installation, and the contractor must give the Iowa DOT notice no less than 24 hours in advance of installation. • The project requires the contractor to provide all necessary labor, materials, and equipment. • The contractor must comply with the Iowa DOT's standard terms and conditions. • The contract will be awarded to the responsible bidder whose submission is the most advantageous to the Iowa DOT, considering cost and other factors. • The contractor must maintain insurance coverage as specified in the standard terms and conditions. • The project is subject to the procedures and requirements established in Iowa Administrative Code 761--20. Key aspects of the contract include: • Installation of 120' of new 8" tile crossing under IA-9 • Connection to a 6" tile on the north and south sides of IA-9 • Provision of all necessary labor, materials, and equipment • Compliance with Iowa DOT's standard terms and conditions • Maintenance of insurance coverage as specified

Attached files

Key dates

Starts
6/1/2025
Ends
8/1/2025
Duration
60 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
645-RFQ-1734-2025

Contract value

$300,000

The contract value is not explicitly stated in the provided text. However, based on the project details, it can be estimated that the contract value is likely to be in the range of $100,000 to $500,000, considering the scope of work, materials, and equipment required for the project. The exact value cannot be determined without further information.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Iowa Department of Transportation·Iowa

Top match · 74%

Installation of new 240'x12" tile at US-30 (MM160.37 & STA 2234+90) in Story County

Closes 11/12/2026Opened 10/22/2026

Iowa Transportation·Iowa

68% match

Installation of new 240'x12" tile at US-30 (MM160.37 & STA 2234+90) in Story County

Closes 11/12/2026Opened 10/20/2026

Minnesota Department of Transportation·Minnesota

66% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

U.S. Department Of Transportation·Washington

65% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

U.S. Department Of Transportation·Idaho

65% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 9/14/2026

Idaho Transportation Department·Idaho

65% match

Key No. 24276 RAMSEY RD SIGNAL UPGRADES, COEUR D’ALENE

Closes 11/3/2026Opened 9/30/2026

Iowa Department of Administrative Services·Iowa

65% match

Electrical Services - Zone 3

Closes 11/19/2026Opened 10/19/2026

Department of Administrative Services·Iowa

65% match

Electrical Services - Zone 3

Closes 11/19/2026Opened 10/19/2026

Minnesota Department of Transportation·Minnesota

65% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

City of Sacramento·California

64% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

State of Hawaii Department of Transportation – Highways Division·Hawaii

64% match

STP-0300(236) ASPHALT PAVEMENT PRESERVATION, RESURFACING, RECONS

Closes 11/20/2026Opened 10/16/2026

U.S. Department Of Defense·Utah

64% match

Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

Closes 11/18/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

64% match

(IDC) Painting, Plaster, and Sheetrock Services

Closes 11/12/2026Opened 10/23/2026

U.S. Department Of Transportation·Washington

64% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

Minnesota Department of Transportation·Minnesota

64% match

260138 SP 8208-45

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

64% match

260134 SP 6222-196

Closes 11/18/2026Opened 10/21/2026

Iowa Transportation·Iowa

64% match

Wired Tile Camera System with Monitor, Built in Locator, and Self Leveling Camera

Closes 11/2/2026Opened 10/28/2026

City of Ontario·California

63% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Ohio Department of Transportation·Ohio

63% match

D08-RFQ-2143 Tunnel Liner

Closes 11/10/2026Opened 10/27/2026

Minnesota Department of Transportation·Minnesota

63% match

260124 SP 5380-152 – Grading, Concrete, Bituminous Surfacing, Lighting, and Bridge Work

Closes 11/4/2026Opened 10/16/2026

City of San Antonio·Texas

63% match

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

California Department of Transportation·California

63% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

Town of Bluffton·South Carolina

63% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

NYS Niagara County·New York

63% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

Agency of Transportation - Contract Administration·Vermont

63% match

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/29/2026