Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Civil Engineering
  5. ›Wastewater Collections Flow Monitoring (PW 2022-049-250803)

Awarded contract·City of Corvallis·Oregon

Wastewater Collections Flow Monitoring (PW 2022-049-250803)

Won by Core & Main +1 more$350kMultiple Award
Contract source

Awarded vendors

  • Core & Main
  • ADS, LLC

Description

The City of Corvallis is seeking a contractor to provide wastewater collections flow monitoring services. The contract includes the installation and maintenance of in-flow monitors, data collection, and reporting. The contractor will be responsible for recording velocity and depth data every 5 minutes and configuring instruments for 15-minute and 1-hour data transmission intervals. The contract term is approximately 3 months. • The contractor will supply, install, program, calibrate, maintain, and provide cloud-based data and reports on 21 sanitary sewer flow monitoring stations. • The contractor will supply, install, program, calibrate, maintain, and provide cloud-based data and reports on 2 rain gages. • The contractor will be responsible for regular routine maintenance on flow monitors, including verification of level, velocity, and cleaning confirmation of unobstructed sensors and weirs. • The contractor will provide cloud-based data and reports to the City of Corvallis.

Attached files

Key dates

Duration
3 months

Last updated

Details

Award type
Multiple Award
Industry
Civil Engineering
NAICS
237110
Solicitation №
PW 2022-049-250803

Contract value

$350,000

The value of this contract is not explicitly stated, but based on the scope of work, it can be estimated to be around $200,000 to $500,000. This estimate is based on the cost of installing and maintaining 21 sanitary sewer flow monitoring stations and 2 rain gages, as well as the cost of providing cloud-based data and reports. The actual value of the contract may be higher or lower, depending on the specific requirements and the bidder's pricing.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Township of North Brunswick·New Jersey

Top match · 71%

Wastewater Collection Oversight Consulting Services

Closes 11/13/2026Opened 10/21/2026

NYS Rockland County·New York

68% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

City of Hollywood·Florida

68% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER DISTRIBUTION, TRANSMISSION & WASTEWATER COLLECTION PROGRAM MANAGEMENT (PROJECT NO. 26-1352)

Closes 11/17/2026Opened 10/13/2026

City of Siloam Springs·Arkansas

67% match

REQUEST FOR QUALIFICATIONS (RFQ) WASTEWATER MASTER PLAN

Closes 11/20/2026Opened 10/18/2026

City of Clearwater·Florida

67% match

Wastewater Collections Point Repair and Improvements

Closes 11/5/2026Opened 9/23/2026

Georgia Pa​ulding County Water System·Georgia

67% match

27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault

Closes 11/13/2026Opened 10/9/2026

City of Charlotte·North Carolina

67% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

The Metropolitan District·Connecticut

67% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Commonwealth of Kentucky·Kentucky

67% match

Water and Wastewater Operations, Maintenance, Monitoring

Closes 11/16/2026Opened 10/28/2026

City of Siloam Springs·Arkansas

67% match

WASTEWATER MASTER PLAN

Closes 11/20/2026Opened 10/18/2026

Prince William County Service Authority·Virginia

67% match

IFB SA 2707 General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping, and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

Carroll County·Maryland

67% match

Water & Wastewater Inspection Services

Closes 12/2/2026Opened 10/21/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

66% match

Great Swamp Wetlands Monitoring Services

Closes 11/19/2026Opened 10/9/2026

Arlington County Government·Virginia

66% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

Maryland City of Baltimore·Maryland

66% match

PROJECT NO. 1407 WASTEWATER COLLECTION SYSTEM PROGRAM MANAGEMENT

Closes 11/19/2026Opened 9/18/2026

U.S. Department Of Veterans Affairs·Delaware

66% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

Massachusetts Town of Lunenburg·Massachusetts

66% match

Operation and Maintenance Services for the Lunenburg Wastewater Collection System

Closes 11/12/2026Opened 10/26/2026

Connecticut City of Norwich·Connecticut

66% match

Cross connections and backflow

Closes 11/16/2026Opened 10/22/2026

Connecticut Town of Stafford·Connecticut

66% match

RFQ: On-Call Engineering Services for Wastewater-Related Needs

Closes 11/17/2026Opened 10/28/2026

Erie County·New York

66% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

City of Rosenberg·Texas

66% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

Connecticut Metropolitan District Commission·Connecticut

66% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Township of North Brunswick·New Jersey

66% match

Water/Wastewater Consulting Services

Closes 11/13/2026Opened 10/21/2026

City of Franklin·Tennessee

66% match

Wastewater Treatment Laboratory Services

Closes 11/4/2026Opened 10/8/2026

City of Sanibel·Florida

66% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026