The 2020 Grinder Pump Replacement Program is a project to replace grinder pumps at 15 sites in the City of Sammamish, King County, Washington. The project includes the installation of new grinder pump assemblies, float switches, control panels, junction boxes, electrical conduit, and restoration of the sites. The engineer's estimate for the project is $150,000. The contract was awarded to Westerlund Excavation LLC and Award Construction, Inc.
• The project consists of 15 sites along East Lake Sammamish Shore Lane NE, East Lake Sammamish Shore Lane SE, East Lake Sammamish Parkway NE, and East Lake Sammamish Parkway SE.
• The project includes the installation of new grinder pump assemblies, float switches, control panels, junction boxes, electrical conduit, and restoration of the sites.
• The engineer's estimate for the project is $150,000.
• The contract was awarded to Westerlund Excavation LLC and Award Construction, Inc.
• The bid submission date was May 6, 2021, at 3:00:00 PM EDT.