The contract is for the procurement of an Apollo II Thermoplastic Handliner System, a thermoplastic walk-behind unit that provides a 3/8” insulating air gap around the material holding tank and an 11” x 7” radiant die heater. The system is manufactured and supplied by M-B Companies, Inc. The contract value is $23,615.00, and the contract duration is 31 days. The key features of the system include an all-in-one speed control and brake system, enabling the operator to slow the unit while traveling down steep terrain.
• The Apollo II Thermoplastic Handliner System is a unique product with specific features.
• The contract was awarded to M-B Companies, Inc., the original manufacturer and sole source supplier of the Apollo Series of thermoplastic application products.
• The contract value is $23,615.00, and the contract duration is 31 days.
• The system is designed for pavement marking and provides an all-in-one speed control and brake system.
• The contract was initiated by Pinellas County, specifically the PUBLIC WORKS department.