The Rufe Snow Drive Reconstruction Project involves the reconstruction of Rufe Snow Drive from IH-820 to Karen Drive. The project includes the removal of existing pavement, excavation, and construction of new pavement, as well as the installation of traffic signals, street lighting, and other improvements. The contract was awarded to Texas Materials Group, Inc. The project is located in the City of North Richland Hills, Texas, and the contract documents provide detailed specifications and requirements for the work to be performed.
Some key features of the project include:
* Reconstruction of approximately 1.5 miles of Rufe Snow Drive
* Removal of existing pavement and excavation
* Construction of new pavement, including concrete and asphalt
* Installation of traffic signals and street lighting
* Pedestrian and bicycle improvements
* Landscaping and irrigation
* Utility adjustments and relocations
* Drainage improvements
The contract documents provide detailed information on the scope of work, technical specifications, and requirements for the project.