The Palominas Recharge and Flood Control Project involves the construction of a storm water detention basin and excavation work within an existing drainage channel. The project is located near milepost 0.18 north of Arizona Highway 92. The engineer's estimate for the project is approximately $1,366,820.00. A job walk was held on January 15, 2014, to familiarize contractors with the scope of work and any conditions that may affect their performance and prices quoted. The submission of a bid shall be conclusive evidence that the contractor is satisfied as to the conditions to be encountered, quality of work to be performed, and quantity of materials to be furnished as per the requirements of the contract documents.
• The project involves the construction of a storm water detention basin and excavation work within an existing drainage channel.
• The project is located near milepost 0.18 north of Arizona Highway 92.
• The engineer's estimate for the project is approximately $1,366,820.00.
• A job walk was held on January 15, 2014, to familiarize contractors with the scope of work and any conditions that may affect their performance and prices quoted.
• The submission of a bid shall be conclusive evidence that the contractor is satisfied as to the conditions to be encountered, quality of work to be performed, and quantity of materials to be furnished as per the requirements of the contract documents.