The Cuyahoga County Department of Public Works awarded a contract for the removal and replacement of chain‑link fencing at the Cuyahoga County Airport. The scope includes demolition of existing fence fabric, barbed wire, top rail, and up to five line posts, followed by installation of a new 10‑ft galvanized chain‑link fence with three rows of barbed wire, new galvanized SS‑40 pipe posts set in concrete footings, and limited new line posts. The contract was awarded through an informal request‑for‑bid process and the total awarded value is $10,915.80.
• Removal of ~84 LF of existing fence and up to five line posts.
• Installation of new 10‑ft galvanized chain‑link fence with 3 rows of barbed wire.
• New posts (SS‑40 pipe) spaced 10 ft on center, set in 12 in × 42 in concrete footings.