This contract covers the comprehensive repair, maintenance, and resurfacing of Wayne State University’s Parking Structure 8, a multi‑story campus garage. The scope includes selective demolition, concrete floor, ceiling, column, and wall repairs; crack and joint sealing; traffic‑topping (new system, recoat, and surface repair); shoring and temporary works; mechanical drainage replacements; steel‑stair connection repairs; painting of traffic markings and stair‑tower areas; and miscellaneous items such as signage repair and elastomeric wall coating. The work is to be performed under a lump‑sum (firm‑fixed‑price) contract with a required 5 % bid bond for proposals ≥ $50,000, performance and payment bonds equal to 100 % of the award amount, and strict compliance with Wayne State wage rates, certified payroll, and insurance requirements. The project must achieve substantial completion of Phase 1 by August 17 2026 and Phase 2 by August 13 2027, with liquidated damages of $100 per day for any delay beyond those dates.
• Concrete repair (partial‑ and full‑depth floor, column, wall, ceiling) and shoring.
• Traffic‑topping and epoxy broadcast overlay covering > 209,500 SF.
• Mechanical drainage, steel‑stair welds, painting, and elastomeric coating (20,000 SF).
• Mandatory compliance with prevailing‑wage, insurance, bonding, and safety policies; award to RAM Construction.