The City of Chico is seeking bids for the construction of a 0.44-mile Class I bicycle and pedestrian facility adjacent to the east side of State Route 99, including a steel bridge overcrossing at East 20th Street and SR99. The project is funded with Federal ATP and CMAQ funds and has a DBE contract goal of 25%. The engineer's estimate for the contract is $10.7 million, and the project has 300 working days. The bid includes various items such as steel bridge fabrication and erection, approach structures, clearing and grubbing, construction surveying, grading, structural excavation, block wall construction, aggregate base, asphalt paving, concrete paving, lighting, traffic signal modifications, fencing, landscaping, striping and markings, roadway signs, and other work as shown on the contract plans.
• The project requires the payment of prevailing wage rates to be paid to members of each craft or classification performing work on the project.
• The project is subject to the "Buy America" provisions of the Surface Transportation Assistance Act of 1982 as amended by the Intermodal Surface Transportation Efficiency Act of 1991.
• The contractor shall list the name, address, and following information of each subcontractor to whom the contractor proposes to subcontract portions of the work.
• The subcontractor's value of work shall be exact numbers, and the word "Approximate", "Estimated", or similar adjectives shall not be used.