This contract is for construction engineering and inspection services for a temporary traffic signal at County Line Rd & Linden Dr. The contract was awarded to HDR Construction Control Corp. and has a term of three years, from November 17, 2020 to November 16, 2023. The contract includes requirements for insurance and compliance with the RFQ document. Some key points of the contract include:
• The contract is for construction engineering and inspection services
• The term of the contract is three years
• The contract includes requirements for insurance and compliance with the RFQ document
• The contract was awarded to HDR Construction Control Corp.
• The points of contact for the contract include Alisa Pike and Patty Hall