The City of Mobile is awarding a stipulated‑sum contract for the complete nuisance‑abatement demolition of all structures located at 1220 Satchel Street. The scope includes wet‑method demolition, removal of debris, hazardous‑material (lead‑based paint and asbestos) handling, utility cap‑off, installation of erosion and sediment control BMPs, and permanent site stabilization with seeding/mulching. The contractor must also provide photographic documentation, a newspaper notice of final completion, and all required close‑out affidavits. The work must be completed within 30 calendar days of the Notice to Proceed, with penalties for late performance.
• Wet demolition of all existing structures, footings, slabs, piers, etc.
• Cap and disconnect sanitary sewer, water, and gas lines to Agency satisfaction.
• Manage lead‑based paint and asbestos‑containing material per NESHAP; provide proper disposal documentation.
• Install erosion‑ and sediment‑control BMPs, then seed/mulch for permanent stabilization.
• Submit before‑and‑after photos, newspaper notice proof, and all required lien‑release affidavits for final payment.