The Stonegate Drainage Improvement Project involves the deepening of an existing subdivision detention pond, installation of a new manhole, pump, and associated piping, along with fencing of the project limits. The contractor will be responsible for removing and disposing of all demolished materials and debris from the work area. The project must be completed by December 31, 2026. Some key points to consider are:
• The project entails a base bid amount and an additive bid amount.
• The contractor must provide all necessary tools and equipment to complete the project.
• The contractor must take proper care to avoid unnecessary noise, clatter, or obstructions in walkways, sidewalks, and roadways.
• The contractor will be liable for damages if the project is not completed within the contract time.
• A pre-bid conference was held on September 17, 2024, at 11:00 AM EDT.