The 2025 Street Revitalization Project #2 is a comprehensive civil‑engineering effort to reconstruct and upgrade streets, sidewalks, utilities, and related infrastructure within the Village of Hoffman Estates, Illinois. The scope includes extensive earthwork, asphalt and concrete paving, drainage and utility installation, erosion control, traffic control, and associated demolition/removal activities. Competitive sealed bidding attracted three qualified contractors, with A Lamp Concrete Contractors, Inc. ultimately awarded the contract at an approximate total bid of $6.25 million. The project reflects a large‑scale municipal street‑revitalization initiative that integrates civil, paving, and utility specialties.
• Core work categories: excavation, backfill, asphalt binder & surface courses, concrete sidewalks & curb‑gutter, storm‑ and sanitary‑sewer installations, fire hydrants, valve boxes, and erosion‑control measures.
• Budget range: $6.25 M–$7.09 M (based on vendor bid totals), with the highest line‑item values in traffic control ($≈ $800 k) and full‑depth asphalt pavement ($≈ $309 k).
• Procurement: sealed‑bid competitive solicitation (open to all qualified bidders) with a bid deadline of 17 Mar 2025; award made to a single vendor, A Lamp Concrete Contractors, Inc.