The Harold Street Wastewater Treatment Plant Improvements Project involves improvements to the treatment plant, including site improvements, liquid treatment improvements, and solids treatment improvements. The project also includes concrete repair work, roofing, and HVAC equipment replacement. The contract was awarded to multiple vendors, including Walters-Morgan Construction, Inc., Crossland Heavy Contractors, and BRB Contractors, Inc. The project is located in Olathe, Kansas, and the contract was initiated by the City of Olathe's Department of Public Works.
• The project includes demolition of existing sludge drying beds, new paving, fencing, and gates, and buried pipelines work.
• The project also includes replacement of a clarifier drive, trickling filter equipment, and plastic media, as well as new piping and valves.
• The contract includes a base bid and multiple deductive alternatives, including automated entrance gate, sludge bed demolition, and asphalt paving.
• The project requires a mandatory pre-bid meeting and site walk-through.
• The contract documents, including drawings and specifications, are available for download on the City of Olathe's website.