The contract is for bridge repairs at various locations, including the Bennett Road Underpass, Grove Street Underpass, and Route 9 Underpass. The work includes pavement and membrane replacement, bridge joint repairs, concrete repairs, and maintenance of traffic. The contract was awarded to CPM Constructors, Inc. The scope of work includes general repairs and modifications to the bridges, as well as the removal of existing structures and obstructions. The contractor will be required to perform the work in accordance with the plans and specifications provided by the Maine Turnpike Authority. Some of the key features of the contract include:
• The contract is for a single award, with a fixed price for the work to be performed.
• The contractor will be required to provide a bid bond, as well as a performance bond and a payment bond.
• The contract includes a liquidated damages clause, which provides for the payment of damages in the event of delays or non-performance.
• The contractor will be required to comply with all applicable laws and regulations, including those related to labor, safety, and environmental protection.
• The contract includes a warranty provision, which requires the contractor to guarantee their work for a certain period of time.