The contract is for the 2024/25 Wastewater Pipe Replacement - CIPP project, which involves constructing approximately 1,063 linear feet of cured-in-place pipe (CIPP) within existing 8-inch and 12-inch concrete sewer, video inspecting, locating, and reconnecting 4-inch sewer service, and constructing required appurtenances. The engineering estimate for the project is $250,000. The contract was awarded to Insituform Technologies, LLC, K & R Plumbing Construction Co., Inc., and Iron Horse, LLC.
• The project involves CIPP construction and sewer service reconnection.
• The engineering estimate for the project is $250,000.
• The contract was awarded to three vendors.
• The project requires the construction of appurtenances and other work as shown on the plans.