The contract is for the construction of Standpipe Recoating, Project No. 5-C-025-13. The work consists of material, labor, and equipment to recoat the interior of the Renner Water Standpipe Facility. The project includes cleaning, surface preparation, abrasive blasting, painting, and disinfection. The bid documents and drawings are available for download, and the bid security is 5% of the total bid. The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds.
• The project location is in Olathe, Kansas.
• The bid opening date was November 14, 2013.
• The engineer's estimate for the project is $432,000.00.
• The awarded vendor is likely to be Worldwide Industries Corp. with a bid amount of $149,936.00.