The Town of Prescott Valley is seeking bids for the construction of the CIP #ST2304 - Glassford Hill Road Improvement Project. The project involves traffic control mobilization, removal of existing pavement and base materials, construction of storm drain system, APS and traffic signal conduit, curb and sidewalk, placement of base materials, pavement, and pavement markings, and application of surface course. The contract documents, plans, specifications, and other information about this bid are available at www.PublicPurchase.com. A non-mandatory pre-bid conference was held on April 10, 2023, and sealed bids were accepted until April 24, 2023. The bid tabulation shows that ASPHALT PAVING & SUPPLY, INC. and EARTH RESOURCES CORPORATION were the two bidders, with bids of $2,517,484.00 and $2,713,369.00, respectively.
• The project involves traffic control mobilization and removal of existing pavement and base materials.
• The construction of storm drain system, APS and traffic signal conduit, curb and sidewalk is required.
• The placement of base materials, pavement, and pavement markings, and application of surface course is necessary.
• A non-mandatory pre-bid conference was held on April 10, 2023.
• Sealed bids were accepted until April 24, 2023.
• The bid tabulation shows that ASPHALT PAVING & SUPPLY, INC. and EARTH RESOURCES CORPORATION were the two bidders.