Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›LARGE DIAMETER SEWER AND SIPHON CLEANING

Awarded contract·The Metropolitan District·Connecticut

LARGE DIAMETER SEWER AND SIPHON CLEANING

$1MAwarded 8/4/2017Single Award
Contract source

Description

This contract calls for comprehensive cleaning and CCTV inspection of large‑diameter sewer lines and associated siphons for the Metropolitan District of Hartford County. The scope includes debris removal, disposal, generation of inspection DVDs and logs, and bi‑weekly electronic summary reports. Work must be performed in accordance with the district’s drawings and specifications, with a mandatory pre‑bid conference and strict submission deadlines. • Labor, equipment, tools, and materials for full sewer line cleaning and CCTV inspection. • Production of digital inspection files, logs, and bi‑weekly summary reports. • Required attendance at a mandatory pre‑bid conference on March 24, 2017 and submission of sealed bids by April 27, 2017.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
4/27/2017
Intent to award
8/4/2017
Awarded
8/4/2017

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2017B-06

Contract value

$1,000,000

No monetary value is disclosed in the provided documents. Based on typical scope—full sewer‑line cleaning, CCTV inspection, reporting, and provision of equipment for a large‑diameter municipal system—a reasonable ball‑park for a single‑vendor contract in Connecticut would range from $500,000 to $2,000,000. Assuming mid‑range complexity and regional labor rates, an estimate of roughly $1 million is plausible.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Pueblo·Colorado

Top match · 74%

2026 Large Main Cleaning

Closes 11/17/2026Opened 10/27/2026

City Utilities·Indiana

71% match

77441 - 2026 Sewer Rehabilitation #2 (Large Diameter)

Closes 11/19/2026Opened 10/29/2026

City of Albany·Georgia

69% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

Prince William County Service Authority·Virginia

69% match

IFB SA 2707-General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

City of West Des Moines·Iowa

69% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Prince William County Service Authority·Virginia

69% match

IFB SA 2707 General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping, and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

City of Phoenix·Arizona

69% match

LARGE DIAMETER SANITARY SEWER REHABILITATION - GRADE 5 & 4 MANHOLES - NORTH - ZONES 5 & 6 - DESIGN-BID-BUILD

Closes 11/3/2026Opened 10/1/2026

Town of Manchester·Connecticut

68% match

FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY

Closes 11/17/2026Opened 10/20/2026

Town of Chase City·Virginia

68% match

Sanitary Sewer Rehabilitation

Closes 12/9/2026Opened 10/29/2026

Washington Suburban Sanitary Commission, MD·Maryland

68% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

City of Phoenix·Arizona

68% match

SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT

Closes 11/30/2026Opened 10/29/2026

Delaware County Regional Sewer District·Ohio

67% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

Portage County·Ohio

67% match

Mantua Sanitary Sewer Rehab-Bid

Rolling / TBD closeOpened 10/7/2026

Connecticut Town of Fairfield·Connecticut

67% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

City of Elgin·Illinois

67% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Ponca·Oklahoma

67% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of Raytown·Missouri

67% match

2026 Sanitary Sewer Maintenance Project: White Oak West

Closes 11/18/2026Opened 10/22/2026

City of Rapid City·South Dakota

67% match

2027 Sanitary Sewer Televising

Closes 11/10/2026Opened 10/24/2026

Greenwood Metropolitan District·South Carolina

67% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Whitehall·Ohio

67% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

U.S. Department Of Defense·Indiana

67% match

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Tacoma·Washington

67% match

Citywide On Call Hydro-Excavation, Vactor Street Sweeping, and Associated Services

Closes 11/10/2026Opened 9/21/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Defense·Missouri

67% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026