The Jerrandy Court Storm Drain Improvement Project involves the installation of storm drain pipes, manholes, and other appurtenant structures. The estimated construction cost is $334,000, and the project requires a Class A contractor's license. The contract was awarded to Dutch Contracting, Inc. with a total bid amount of $396,397. The project includes various components such as storm drain pipe installation, manhole construction, and asphalt concrete paving. The contractor is required to comply with the California Public Contract Code and the Subletting and Subcontracting Fair Practices Act.
• The project consists of installing approximately 308 lineal feet of storm drain pipe.
• The project includes the construction of two manholes and one drainage inlet.
• The contractor is required to perform various tasks such as trench shoring and bracing, construction site sign installation, and testing of the system.
• The contractor must also comply with the Iran Contracting Act and provide certification or exemption documentation.
• The project requires the contractor to list subcontractors performing work in excess of one-half of one percent of the total bid amount.