This contract involves the replacement of the Geryville Pike Culvert 304 stone masonry endwall with a reinforced concrete endwall. The project includes various items such as clearing and grubbing, class 1B excavation, class 4 excavation, subbase 6" depth, and more. The contract was awarded to four vendors: Flyway Excavating, Inc., Bill Anskis Company, Inc., Floyd G. Hersh Inc., and Construction Masters Services, LLC. The total bid price for each vendor is as follows: Flyway Excavating, Inc. - $294,815.00, Bill Anskis Company, Inc. - $257,236.00, Floyd G. Hersh Inc. - $188,775.00, and Construction Masters Services, LLC. - $199,494.50. Some key points to note are:
• The project requires the replacement of the existing culvert endwall with a reinforced concrete endwall.
• The contract includes various items such as excavation, subbase, and concrete work.
• The contract was awarded to four vendors, each with a different bid price.
• The total bid price for each vendor is listed in the line item bid table.
• The contract does not specify a start or end date, or a duration.
• The point-of-contact person is Ray Heydt, who can be reached at
[email protected] or (610) 278-3037.