This contract is a unit‑price agreement for the design, installation, testing, and ongoing maintenance of Building Automation (Control) Systems for Washington County Public Schools. The awardee, Control Systems, Inc., is authorized to bill based on pre‑approved hourly labor rates for various trades (Project Manager, Application Engineer, BAS Technicians) and is limited to specified markup percentages (20 % on materials, 15 % on sub‑contracts and equipment rentals). The agreement defines daytime (7:30 AM‑4:00 PM) and evening (4:00 PM‑12:30 AM) shifts, establishing the operational framework for work execution.
• Scope covers full‑service BAS work including project management, engineering, installation, and HVAC mechanic support.
• Labor rates are capped at “maximum charged during the year” and include all overhead, providing cost predictability for the school district.
• Contractor margins are capped (20 % material, 15 % sub‑contractor/equipment), ensuring transparent pricing.