Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›19-4980 JOC Master Wet Utility Pipeline Projects (Peoria…

Awarded contract·City of Goodyear·Arizona

19-4980 JOC Master Wet Utility Pipeline Projects (Peoria COOP)

Won by Hunter Contracting Co.$3MSingle Award
Contract source

Awarded vendors

  • Hunter Contracting Co.

Description

This contract is for Job Order Contracting (JOC) services for wet utility pipeline projects in the City of Peoria, Arizona. The contract was awarded to Hunter Contracting Co. and has a term of one year with the option to renew for up to four additional years. The contract includes provisions for cooperative purchasing, insurance, and indemnification. The scope of work includes survey, design, and construction services for wet utility pipeline projects. The contract also includes a pricing matrix and a project cost sheet. Some key points about this contract include: • The contract is for JOC services for wet utility pipeline projects. • The contract was awarded to Hunter Contracting Co. • The contract has a term of one year with the option to renew for up to four additional years. • The contract includes provisions for cooperative purchasing, insurance, and indemnification. • The scope of work includes survey, design, and construction services for wet utility pipeline projects. • The contract includes a pricing matrix and a project cost sheet.

Attached files

Key dates

Starts
7/16/2019
Ends
5/31/2020Renews
Duration
1 year

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237110
Solicitation №
145201

Contract value

$3,000,000

Based on the contract details, it is difficult to estimate the exact value of the contract, as the contract amount is not explicitly stated. However, the contract includes a pricing matrix and a project cost sheet, which suggests that the contract value may be based on a unit price or a cost-plus arrangement. Assuming an average cost per project, the total contract value could be in the range of $1 million to $5 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Maryland Wicomico County Board of Education·Maryland

Top match · 73%

Plumbing JOC

Closes 11/12/2026Opened 10/21/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

70% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Texas ESC Region 8·Texas

70% match

Energy and Water Efficiency Goods and Services (2 Part with JOC)

Closes 11/19/2026Opened 10/1/2026

U.S. Department Of Defense·Mississippi

69% match

W912EE27BA002 - Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ Waterway

Closes 11/16/2026Opened 10/30/2026

City of Columbus Ohio·Ohio

69% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

City of Redlands·California

68% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

The Metropolitan Water District of Southern California·California

68% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Des Moines - Iowa·Iowa

68% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

U.S. Department Of Energy·Washington

68% match

SOLICITATION NUMBER 393273 “BLANKET MASTER AGREEMENT (BMA) FOR HANFORD TANK FARMS VADOSE DRILLING SERVICES”

Closes 12/14/2026Opened 10/26/2026

City of Pomona·California

68% match

RESERVOIR NO. 2C REPAIRS AND SAFETY IMPROVEMENTS FD528 – CC8125 – PROJECT WORKTAG 95082

Closes 11/18/2026Opened 10/8/2026

Northeastern Illinois University·Illinois

68% match

Invitation for Construction Bid: FY28 JOC Procurement

Closes 12/9/2026Opened 10/28/2026

University of Illinois at Chicago·Illinois

68% match

Invitation for Construction Bid: FY28 JOC Procurement

Closes 12/9/2026Opened 10/28/2026

U.S. Department Of The Interior·Utah

67% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

LA Water & Power·California

67% match

137000 GROUT, MASTER FLOW

Closes 11/19/2026Opened 10/27/2026

Massachusetts Town of Holliston·Massachusetts

67% match

WWTP Yard Piping Phase 1D

Closes 11/12/2026Opened 10/21/2026

La Joya ISD·Texas

67% match

Construction Services Job Order Contract (JOC)

Closes 11/6/2026Opened 10/17/2026

Town of Upton·Wyoming

67% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

Eastern Municipal Water District·California

67% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of Sacramento·California

67% match

Municipal Groundwater Well Drilling Contractors

Closes 11/19/2026Opened 10/29/2026

University of Missouri-Columbia·Missouri

67% match

Various Locations - Plumbing Trades Blanket (CP270411)

Closes 11/3/2026Opened 9/30/2026

Georgia City of Cartersville·Georgia

67% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Gilbert·Arizona

67% match

Parks and Recreation JOC

Closes 11/17/2026Opened 10/15/2026

City of Richland·Washington

67% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026