The contract is for the construction of Solid Waste Parking Lot Improvements, which includes the removal of existing asphalt and concrete, and the installation of new concrete paving. The contract was awarded to Amino Brothers Co. Inc. for an amount of $229,025.35. The project involves various tasks such as removal of existing pavement, subgrade repair, installation of concrete paving, erosion and sediment control, traffic control, and striping. The contract documents include plans, specifications, and bid forms.
• The project involves the removal of approximately 3,832 square yards of existing asphalt and 320 square yards of existing concrete.
• The project includes the installation of 4,152 square yards of concrete paving.
• The contract requires the contractor to provide a satisfactory bid bond, performance bond, and payment bond.
• The contract has a duration, but the exact duration is not specified in the provided documents.
• The contract was awarded on October 18, 2011, and the bid date was October 6, 2011.