Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Construction
  5. ›Pump Station Roadway Replacement, Capital Project No. 2425

Awarded contract·Four Rivers Sanitation Authority·Illinois

Pump Station Roadway Replacement, Capital Project No. 2425

Won by Norwest Construction, Inc.$334kSingle Award
Contract source

Awarded vendors

  • Norwest Construction, Inc.

Description

The Four Rivers Sanitation Authority (FRSA) in Rockford, Illinois, issued a competitive bid (No. 23‑411) for the replacement of roadways, curbs, gutters and associated pavement at fourteen pump‑station sites throughout Winnebago County. The work includes demolition of existing pavement, excavation to 14 in., placement of CA‑2 and CA‑6 aggregate base courses, installation of hot‑mix asphalt binder and surface courses, concrete curb & gutter where required, top‑soil placement, turf restoration and seeding, traffic control, and final cleanup. The contract is to be completed by November 17 2023, with a $300 per day liquidated‑damages clause for late completion. FRSA required a 5 % bid bond, 100 % performance bond, and labor‑&‑material payment bond, and is exempt from Federal Excise Tax and Illinois Retailers’ Occupational Tax. Norwest Construction, Inc. was the low bidder (total $334,414.90) and was awarded the contract. • Scope: roadway removal, base‑course installation, HMA binder & surface courses, curb & gutter, topsoil, seeding at 14 pump‑station locations. • Schedule: work must be finished by 17 Nov 2023; pre‑bid meeting held 15 Aug 2023; bid opening 22 Aug 2023. • Procurement: full and open competition, unit‑price pricing, award to lowest responsive, responsible bidder. • Bonds/Insurance: 5 % bid bond, 100 % performance bond, labor‑&‑material payment bond; insurance requirements per FRSA specifications.

Attached files

Key dates

Bids closed
8/22/2023
Contract modified
8/8/2023
Ends
11/17/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
23-411

Contract value

$334,415

The bid tab shows Norwest Construction, Inc. as the low‑bidder with a grand total of $334,414.90. Since the contract was awarded to the low bidder, the contract value can be taken as approximately $334,415. No other monetary figures (e.g., change orders or allowances) are provided, so this figure represents the best estimate of the contract’s overall dollar value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Hilliard, Ohio·Ohio

Top match · 75%

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

City of San Diego·California

74% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Waynesboro·Virginia

74% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

Jea·Florida

74% match

1412232281 (IFB) Carlotta Road Pump Station Upgrade

Closes 12/1/2026Opened 10/28/2026

City of Camden·South Carolina

74% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

Charles County Government·Maryland

74% match

Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)

Closes 11/4/2026Opened 9/24/2026

Gwinnett County Government·Georgia

73% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Miami‑Dade County Water & Sewer Department·Florida

73% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

Connecticut Town of South Windsor·Connecticut

73% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Frazee, MN·Minnesota

73% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

City of Tampa, Florida·Florida

73% match

26-C-00018 Gunlock Pump Station Force Main Replacement

Closes 11/17/2026Opened 10/16/2026

City of Tampa, Florida·Florida

73% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

Jea·Florida

73% match

1412230880 (IFB) Construction Services for the Cleveland Road - Force Main Crossings

Closes 12/8/2026Opened 10/28/2026

Minnesota Department of Transportation·Minnesota

72% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Massachusetts Town of Marion·Massachusetts

72% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

City of Winchester·Virginia

72% match

Jefferson Street Pump Station Replacement

Closes 11/12/2026Opened 9/25/2026

City of Hollywood·Florida

72% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

City of Fargo·North Dakota

72% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Key West·Florida

72% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Minnesota Department of Transportation·Minnesota

72% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Massachusetts Town of Nantucket·Massachusetts

72% match

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

City of Lino Lakes·Minnesota

72% match

Lift Station #53 Rehabilitation

Closes 11/5/2026Opened 10/14/2026

City of Branson·Missouri

72% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Jackson County Utility Authority·Mississippi

71% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Brazos Valley·Texas

71% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026