The Boyden Road Culvert # 164-07709 Re-Lining Project involves the re-lining of an existing 72” CMP culvert with a resin-based liner system. The project includes removal of debris and obstructions, preparation of the surface for lining, bypass pumping, and temporary traffic control. The contract was awarded to Advance Rehabilitation Technology for an amount not to exceed $66,686.00. The project is located in Sagamore Hills Township, Ohio, and has a fixed completion date of November 20, 2015. Key aspects of the project include:
• Re-lining of an existing culvert
• Removal of debris and obstructions
• Preparation of the surface for lining
• Bypass pumping and temporary traffic control
• Fixed completion date of November 20, 2015
• Contract amount not to exceed $66,686.00