This contract is for drainage improvements for the Houmont Park Subdivision on Green River Drive in Harris County Precinct 1. The project includes the installation of a 26-foot-wide asphalt roadway, underground storm sewer, and other drainage improvements. The contract was awarded to AAA Asphalt Paving, Inc. in the amount of $11,390,691. The project aims to reduce flood risk and strengthen resiliency in the community. Key features of the project include:
• Installation of a 26-foot-wide asphalt roadway
• Installation of an underground storm sewer
• Filling in of existing ditches and placement of shallow swales
• Removal and disposal of existing asphaltic surface and base material
• Installation of flex beam guardrail and terminal anchor section
• Construction of detours and installation of traffic control devices
• Restoration of loop detectors and connection to control box
The contract has a duration of one year, and the expected impact is to alleviate structural flood damage to homes in the community.